Project-specific pipe recovery package positioned on the rig before drilling, reducing mobilisation delays if pipe or the BHA becomes stuck.
The Standby Pipe Recovery package puts the required recovery tools on the rig before drilling begins. Equipment is selected around the workstrings used during the project and the drilling activities with a higher risk of stuck pipe.
Cutters, punchers, severing tools and other recovery equipment can be included. Dangerous goods and items with longer lead times can be packed in a mobile bunker and positioned on board when drilling commences, reducing the need to wait for equipment availability or dangerous goods shipments.
Any additional equipment required can be supplied in heliportable packages and mobilised on call-off.
Package tailored to the project and planned workstrings
Equipment selection before drilling begins
Cutters, punchers and severing tools available as part of the package
Mobile bunker for dangerous goods and longer-lead items
Recovery equipment positioned on the rig in advance
Additional heliportable equipment available on call-off
Contingency planning for drilling operations
Standby support for stuck-pipe and BHA recovery
Projects requiring advance mobilisation of dangerous goods
Operations where equipment lead times could delay recovery
Contact our team to discuss a Standby Pipe Recovery package for your drilling programme.
Applied across well intervention operations.